Nexus City construction audit
Result: PASS
Sites: 32
Station entrances: 5
Declared continuous streets: 12
Iron elevator pads: 297
Paired beds: 120
Contained source-water cells: 2422
Checks: whole-volume scaffold absence; carriageway floor/headroom; five-wide entry clearance; connected front/side/rear promenades; architectural glyphs and supported portals; paved entrance connectivity; building floors/roof/lift and station stair reachability; terminal/NPC and residential door/bed/kitchen approach; bed/door pairs; water boundaries; actual room furniture/bounds; ground-connected roof/fixture geometry.
Limits: simplified offline collision, not actual server physics, block updates, visual approval or runtime service activation.
